Our Scientific Process

OUR IMPLEMENTATION PROTOCOL

How We Work

Our structured scientific deployment checklist from initial client alignment to final air validation testing.

1

Consultation

Identifying containment scope, air particle ratings, and clean zone compliance criteria.

2

Site Inspection

Physical geometric analysis of air intakes, structural support columns, and HVAC loops.

3

Design & Planning

Developing custom double-skin PUF panel layouts, airflow models, and pressure configurations.

4

Manufacturing

Precision cutting and continuous argon purges to fabricate heavy-grade SS304 enclosures.

5

Installation

Airtight assembly of wall profiles, ceiling support rods, double safety doors, and HEPA frames.

6

Support & Maintenance

Routine differential calibration reviews, filter leak audits, and fast technical support responses.

Rigorous air audit protocol

Strict Cleanroom Validation Testing

Before we hand over any cleanroom setup, we execute multiple validations verifying that structural joins are hermetically sealed and laminar flows comply with safety specifications.

We perform filter integrity tests (PAO/DOP), room pressure differential measurements, particle concentration counts, and airflow visualization trials, delivering a complete ISO compliance validation document with every installation.

Validation Metrics Included

  • done Aerosol HEPA Filter Leak Testing (PAO)
  • done Differential Pressure Calibration Audits
  • done Laminar Air Velocity Profiles Monitoring
  • done Particle Concentration Logging Checks